metal lathe

see attached 

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

OSH

4

3

0

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

6

Unit VI Risk Assessment Form

 

 

Severity

Likelihood

Risk Rating

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Job Title:

Analyst Name:

Date:

 

Metal Lathe Operation

 

Task Description:

 Setting up and operation of a metal lathe.

#

Task Steps

Hazard and Effect

Initial Risk

Risk Reduction Tactics

Residual Risk

Basic description of task steps recorded in sequence

Description and effect of existing and potential hazards based on observation and experience.

Severity

Likelihood

Risk Rating

Description of risk reduction tactics for each hazard using the Hierarchy of Controls method.

1

 Load workpiece onto lathe.

Potential back injuries or muscle strain; some workpieces weigh more than

5

0 pounds

2

 Start lathe.

Possible entanglement with moving parts

3

Apply cutting tool to workpiece.

 
 
 
 
 

Hazardous noise; average

9

5dBA for an eight-hour work shift could cause hearing loss

4

 Contact with metal chips; cuts and eye hazard

5

 Contact with metal coolant; skin and eye contact.

6

 Leaking hydraulic hoses; skin contact

7

 Incorrect technique could cause cuts and crushing injuries

8

Incorrect posture could cause muscle strain and fatigue

9

Remove workpiece from lathe.

 

 Potential back injuries or muscle strain

10

 Slip and fall due to coolant or hydraulic fluid on floor

Comment/Discussion (200-word minimum)

Risk Assessment for Metal Lathe

You have been asked to conduct a risk assessment for a metal lathe operation. The Job Hazard Analysis has already been completed, and hazards for the operation have been identified. The task steps and hazards have been entered on the risk assessment form. Click here to access it.

To complete the project, you will need to address the following criteria:

For each hazard listed, estimate its severity and likelihood using the risk matrix on page 283 of the course textbook. This initial estimation assumes no risk control tactics are applied. Use the matrix to assign a risk rating based on the estimated severity and likelihood. Enter these numbers in the appropriate initial risk columns on the form.

Implement one or more risk-reduction tactics for each hazard using the hierarchy of controls method. Describe these tactics in the appropriate column on the form.

In the comments section of the form, summarize the changes in risks that resulted after control tactics were applied and whether the risks have been reduced to an acceptable or tolerable level. Are there any additional actions that you recommend be taken? The discussion section must be at least 200 words.

Are you stuck with your online class?
Get help from our team of writers!

Order your essay today and save 20% with the discount code RAPID